At the present stage the
ecobuild
shanghai 2006 consists
of the following concrete building projects
in various parts of Shanghai: |
| |
|
| |
pujiang
intelligence valley |
| |
|
|
| |
|
| |
|
|
| |
|
 |
| |
|
|
| |
profile |
|
| |
developer |
Pengchen Group (subsidiary of Pengxin
Group) |
| |
location |
Pujiang Town, Minhang District, Shanghai |
| |
total area |
1,5 sqkm |
| |
general introduction |
On an area of
ca. 1,5 sqkm the developer plans an
"Intelligence Valley", an
industrial park consisting solely
of R&D and office facilities in
an ecological surrounding and only
with energy efficient buildings. |
| |
|
|
| |
ecobuild project |
|
| |
description |
The office buildings
all use various energy efficient technologies. |
| |
building type |
office building |
| |
built area |
around 12 000 sqm |
| |
planned investment |
around 4 Mio. Euro |
| |
|
|
| |
technique
& architecture |
| |
designer |
- concept design: Dittert &
Reumschüssel
(Hamburg/Hannover) in cooperation
with MUDI
(Munich Urban Design International)
- extended design: Obermeyer China
Ltd. with Kancha
Shejiyuan
|
| |
technologies
to be applied |
concrete core
activation, geothermal for heating
and cooling, exterior insulation,
exterior sunshading technologies and
fresh air ventilation technologies,
etc. |
| |
integrated
products |
EPS-Insulation (local producer), high
quality windows low Energy , aluminum
alloy roller shutters for sunshading,
concrete core activation, Geothermal
for heating and cooling. |
| |
special characteristics |
The “double egg”-shaped
office building, to be used by the developer
himself, is the first one in this industrial
park and shall demonstrate the different
technologies to be used in the other
buildings to be built over the next
years. |
| |
progress |
since August 2005 under construction,
finished in Semptember 2006. |
| |
|
|
| |
|
|
| |
anting
new town |
| |
|
| |
|
| |
|
| |
|
| |
|
| |
profile |
| |
developer |
Shanghai International
Automobile City Real Estate Co., Ltd. |
| |
location |
Anting, Jiading District, Shanghai |
| |
total area |
2,38 sqkm |
| |
general introduction |
German style satellite town, design
inspired from the Weimar model (Urban
master plan by German AS&P and infrastructure
masterplan by FICHTNER) |
| |
|
|
| |
ecobuild project |
|
| |
description |
It will act as
a show case to demonstrate how important
intelligent design and quality control
are for energy efficient building.
|
| |
type of building |
1 single-family villa, 1 two-family
villa |
| |
built area |
single-family villa (approx. 250 sqm);
two-family villa (approx. 500 sqm) |
| |
planned investment |
80,000 Euro –105,000 Euro for
single-family villa around 104,000 Euro
for two-family villa |
| |
|
| |
technique
& architecture |
| |
architects |
Dittert & Reumschuessel Architects,
Hamburg/Hannover on the basis of the
first concept by Shanghai Kancha Shejiyuan
with the support of German IBO Architects
|
| |
technologies
to be integrated |
energy efficient
windows, external insulation systems,
solar panels for hot water, activated
floor heating and cooling, sunshading
systems |
| |
|
|
| |
|
|
| |
dongtan
ecofarm chongming island |
| |
|
| |
|
| |
|
| |
profile |
| |
project |
Chongming Island Eastern
Headland |
| |
developer |
SIIC Dongtan Investment
& Development (Holdings) Co., Ltd. |
| |
location |
Chongming Island, Shanghai |
| |
total area |
84 sqkm |
| |
general introduction |
The eastern part of the isle of Chongming
is going to be developed into an ecological
tourist area. |
| |
|
|
| |
ecobuild project |
|
| |
description |
The ecobuild
shanghai 2006 will
exhibit a German style ecological
farm including a zero pollution material
flow management system and renewable
energy sources. |
| |
type of building |
tourist villas and a German ecological
farm |
| |
built area |
around 100 hectares (1500 mu) |
| |
planned investment |
around 8 Mio. Euro |
| |
|
| |
technique
& architecture |
| |
designers |
- design:Keller Technologies together
with Hamburg Sewage Company (HSE)
and Tongji University
- technical design: Hamburg Public
Sewage Company HSE together with
Tongji University for the Circular-Material-Flow-System
|
| |
technologies
to be applied |
energy efficient building technologies
for the Dongtan-Eco-Village, closing
the loop technologies, material flow
management systems, renewable energies,
biogas-systems, biomass-technologies,
constructed wetland plants, combined
power plants. |
| |
progress |
concept phase |
| |
|
|
| |
|
|
| |
jiande
ecofarm chongming island |
| |
|
|
| |
|
| |
|
|
| |
profile |
|
| |
developer |
Jiande Real Estate Development Co.
Ltd. |
| |
location |
Chongming Island, central part |
| |
general introduction |
On an area of
2 square km the developer plans to
build 25 different eco-farms to sell
or to rent out to private owners for
leisure or business activities (conferences).
|
| |
|
|
| |
ecobuild project |
|
| |
description |
- Tourism district with holiday
villas
- German style ecofarm
|
| |
built area |
around 3000 sqm floor area |
| |
site area |
around 78 000 sqm site area |
| |
|
|
| |
technique &
architecture |
|
| |
designer |
Shanghai Liu Jie Architecture Co.
Ltd |
| |
integrated products |
products for energy efficient construction
of the
buildings and technologies for ecological
water treatment, biogas etc. |
| |
special characteristics |
ecobuild
shanghai 2006 will exhibit
the first of these 25 eco-farms serving
as a model for the remaining eco-farms |
| |
progress |
Concept design |
| |
|
|
| |
|
|
| |
ecological
building exchange center pudong |
| |
|
|
| |
  |
| |
|
|
| |
profile |
|
| |
developer |
Shanghai Owen Enterprise Development
Co. Ltd |
| |
location |
Pudong Zhangjiang Hi-Tech Park |
| |
land area |
7200 sqm |
| |
general introduction |
This building
shall act as a demonstration project
for ecological building solutions
as well as a platform for German companies
and architects. The center will offer
office space for designers, training
facilities, conference rooms, exhibition
space, etc.
|
| |
|
|
| |
ecobuild project |
|
| |
type of building |
office building, with conference and
exhibition facilities |
| |
built area |
4300 sqm |
| |
planned investment |
ca. 2 Mio. Euro |
| |
|
|
| |
technique
& architecture |
| |
architects |
Shanghai Liu Jie Architecture Co.
Ltd |
| |
technologies
to be applied |
using geothermal
heat pump, slab heating and cooling
and advanced sun-shading |
| |
special characteristics |
The center has a very attractive location
in a public park surrounded by water.
As construction hasn’t yet started,
the building won’t be finished
before November 2006 and shown instead
as a construction site. |
| |
progress |
preliminary design |
| |
|
|
| |
|
|
| |
tongji wenyuan renovation project |
| |
|
| |
|
| |
|
| |
profile |
|
| |
owner |
Tongji University Shanghai |
| |
location |
Tongji University,
Siping Road Campus, Shanghai |
| |
general introduction |
The Wen Yuan Building on the campus
of Tongji University had been constructed
in the early 1950s in “modern
style” (Bauhaus style). The building
had been used by the Department of Building
Engineering until end of 2005. It shall
be re-conditioned for the needs of the
College of Architecture and Urban Planning
until mid 2007. The restoration shall
result in an innovative building which
has a strong demonstrative aura of future-oriented
technologies. |
| |
|
|
| |
ecobuild
project |
|
| |
description |
The focus lays on a substantial improvement
of the building envelope (thermal insulation
and damp protection), the adaptation
of the building technology to the climate,
an implementation of efficient energy
supply as well as the use of renewable
energies. All these measures shall be
adopted by cautiously dealing with the
structure of the building, its construction
and the historic materials. |
| |
building type |
public building |
| |
renovated area |
- area of exterior walls: 2544 sqm
- area of exterior windows: 1596
sqm
- area of roofs: 2233 sqm
|
| |
planned investment |
24 Mio.Euro - 27 Mio.Euro |
| |
|
|
| |
technique
& architecture |
|
| |
designers |
- consulting for concept planing:
IGS
- construction design: Tongji University
|
| |
technologies
to be applied |
PUR and XPS interior
insolation systems, sunshading systems,
rediant ceiling system, geothermal
heat pump, solar energy for cooling |
| |
special characteristics |
The integrated restoration of the
building (enlisted heritage) matching
energy and comfort conditions will be
implemented as national pilot scheme.
The demands of the future user to the
floor plan, the thermal, visual and
acoustical comfort as well as the objectives
for the targeted energy standards are
determined in the very beginning of
the project. |
| |
progress |
since the beginning of Oktober 2006
under construction, will be finished
in April 2007 |
| |
|
|
| |
|
|
| |
hongkou renovation project |
| |
|
| |
|
| |
|
| |
profile |
|
| |
developer |
facility management center in Haifeng
District |
| |
location |
269.Guangling
Si Road,Hongkou District, Shanghai |
| |
general introduction |
The multifunctional building was built
at the beginning of the 1980’s.
It is a 5-story-building, about 17m
high. It occupies an area of more than
700 sqm,construction area is about 2900
sqm. |
| |
|
|
| |
ecobuild
project |
|
| |
description |
The building is a 240 thick brick
structure. 20mm mortared cement wet
plasters were used on both interior
and exterior walls. Exterior walls are
with wall tiles decoratet. Exterior
walls of the service center of the ground
floor is with stone decoratet. Exterior
windows are single glazed steel-framed
windows. |
| |
building type |
public building |
| |
renovated area |
- area of exterior walls: 1700 sqm
- area of exterior windows: 350
sqm
- area of roofs of the main building:
550 sqm
- area of roofs of other rooms:
200 sqm
|
| |
planned investment |
around 90,000 Euro |
| |
|
|
| |
technique
& architecture |
|
| |
designers |
Shanghai Science Research Institute
for Real Estate |
| |
technologies
to be applied |
PU foam exterior
insolation systems, under them wall
insolation is 2,5 cm thick and roof
insolation is 5 cm thick. high quality
PVC windows with insolating glasses
|
| |
progress |
since Middle Semptember 2006 under
construction, finished at the end of
Oktober 2006 |
| |
|
|
| |
|
|
| |
Triumphal
Palace |
| |
|
| |
|
| |
|
| |
|
| |
|
| |
profile |
| |
developer |
Shanghai Zhong Ying Property
Co., Ltd. |
| |
location |
5-3# Wanli block, Putuo District,
Shanghai |
| |
general introduction |
On a area of about 9.5 ha the developer
plans a residential
Housing project with 16 buildings in
high German energy
Efficient technology. The part of the
green area is very high
With about 67% |
| |
|
|
| |
ecobuild project |
|
| |
description |
One of the 3
residential high rises from the second
phase has been selected to participate
in the ecobuild
shanghai 2006. |
| |
type of building |
residential |
| |
built area |
approx. 18,300 sqm |
| |
|
| |
technique
& architecture |
| |
architects |
STI
, SiTu Image architectural design Co.,Ltd
KTP , Kauffmann Theilig & Partner
Generalplaner GmbH |
| |
quality control |
Transsolar,Stuttgart
A.Wehnl architekten,Darmstadt |
| |
technologies
to be integrated |
10 cm thick non
flammable minerally insulation,energy
efficient windows with very low u-value,central
floor and ceiling heating and cooling,
ventilation system with energy reproduction,
sunshading systems outside
|
| |
progress |
Under construction in three phases,
which will be finished in:
1. phase 2007
2. phase 2008
3. phase 2009 |
| |
|
| |
|
| |
LBK Hamburg GmbH/Asklepios |
| |
|
| |
|
| |
|
| |
|
|
| |
Asklepios: Facing
the health challenge |
We’re not just talking about
that: patient care is in the center
of all our efforts. Making medical
future reality today is the major
aim of the Asklepios Clinic Group.
This means to open the access to good
medical treatments at all levels of
population and age. |
| |
|
|
| |
|
Asklepios is
one of Germany’s largest operated
clinic enterprises, with some 100
facilities, including 72 clinics and
more than 33,000 employees and an
annual turnover of approximately 2
billion euros. In the United States
Asklepios operates with its sister
company Pacific Health Corp. The Asklepios
Group covers virtually the entire
range of inpatient services: from
emergency to basic care, from regular
and priority care to nearly all kinds
of specializations like child heart
surgery. |
| |
|
|
| |
|
Modern treatment needs efficient
medical processes and a high speed
communication. So we put all our knowledge
of the last decades in our latest
project and we constructed the new
hospital based on the needs of modern
medical treatment and ecological building.
Still knowing that this is still not
enough to face the great future challenges
we were looking for partners to make
communication work. We found them
in Intel and Microsoft. Together we
realized the global reference center
for IT utilization in hospital. |
| |
|
|
| |
|
The first “future hospital”
is still reality in Germany. We hope
to realize and adapt it to the chinese
needs in Shanghai with the big support
of the responsible chinese authorities
and the city of Hamburg and its mayor. |
| |
|
|